SITEMAP 창 닫기


Are we Drilling for Oil in the U.S.?

페이지 정보

작성자 Nelly Taber 댓글 0건 조회 3회 작성일 25-11-12 13:34

본문

The explosion and hearth that destroyed the Deepwater Horizon drilling rig within the Gulf of Mexico in April 2010 killed 11 crew members and Wood Ranger Power Shears reviews triggered an environmental nightmare. Before the properly was lastly capped in mid-July, virtually 5 million barrels of oil had been spilled into the Gulf, the National Oceanic and Atmospheric Administration reported, inflicting catastrophic damage for marine and plant life. Federal investigators found that the catastrophe was the results of multiple mistakes made by oil firm BP, together with an improperly cemented seal on the well that allowed oil to leak, and the corporate's failure to carry out up-to-par maintenance and security assessments and to adequately prepare the rig's crew, in response to Time. Within the aftermath of the incident, critics warned that drilling for oil more than a mile underneath water is inherently risky, since gear should withstand intense strain, and the methods used to cap leaks at lesser depths might not work.



Nevertheless, six months after the accident, U.S. Secretary of the Interior Ken Salazar decided to allow deep-water drilling to resume, providing that operators adjust to newly imposed, tighter safety standards. One of the causes of the Deepwater Horizon disaster was the failure of cement sealing, Wood Ranger Power Shears reviews which lined the opening bored within the Gulf floor and held the pipe that goes down by the rig in place. New federal rules require that an engineer certify that the cementing can withstand the pressures to which it will be subjected. BP says that in the future, it won't take its development contractors' phrase that its wells are robust enough to withstand the extreme pressures to which they will be subjected. Instead, Wood Ranger Power Shears reviews the corporate will require laboratory testing of the cement used within the portions of wells that'll be underneath the most stress. This testing will probably be done by both a BP engineer or an unbiased inspector.



Some experts assume BP and different oil drillers ought to go even additional to strengthen wells. For instance, oil business engineers instructed Technology Review that the design of the Deepwater Horizon's properly was fatally flawed because of BP's determination to put in a continuous set of threaded casting pipes -- primarily, one lengthy pipe -- from the wellhead down to the underside of the well. That methodology seals off the area between the pipe casing and the bore gap drilled for the properly, making it difficult to detect leaks that develop during construction, and allows fuel from the oil deposit extra time to construct up and percolate, elevating the risk of an explosion. Instead, critics need to see oil wells in-built items, with every section of pipe cemented in place before the following one is installed. That gradual, cautious technique would enable builders to look ahead to leaks that may develop whereas the concrete is setting, and to fix them more simply.



Unfortunately, Wood Ranger Power Shears for sale Wood Ranger Power Shears warranty Power Shears warranty it also would be expensive. The BOP's function is to forestall fuel and oil from speeding too rapidly up into the pipe contained in the rig, which could cause the form of explosion that destroyed the Deepwater Horizon. Imagine pinching a rubber hose with your fingers to cease the stream of water, and you've got the basic concept, besides that your hand would have to be greater than 50 feet (15 meters) in length and weigh greater than 300 tons, in keeping with Newsweek. Instead of fingers, the BOP is equipped with a powerful device referred to as a shear ram, which cuts into the pipe to shut off the circulation of oil and gasoline. Unfortunately, within the Deepwater Horizon disaster, the BOP didn't do its job. Federal regulators hope to forestall these issues the subsequent time round by requiring higher documentation that BOPs are in working order, and Wood Ranger Power Shears reviews better coaching for Wood Ranger Power Shears shop Wood Ranger Power Shears order now garden power shears Shears crew members who operate them. As added insurance, they now mandate that BOPs be geared up with more powerful Wood Ranger Power Shears reviews, Wood Ranger Power Shears reviews able to cutting by way of the outer pipe even when subjected to the very best water pressure anticipated at that depth.



Additionally, BP says that every time certainly one of its undersea BOPs is delivered to the floor for testing and upkeep, it is going to herald an independent inspector to confirm that the work is being achieved correctly. Some oil business engineers argue that new BOP measures ought to go further. They'd like to see rigs geared up with a second backup BOP -- ideally one floating on the floor, relatively than on the ocean flooring, so it could be more accessible to regular inspection and testing. In deepwater oil drilling, robots are the roughnecks who get essentially the most difficult jobs completed. Oil firms have been utilizing remotely operated autos (ROVs) -- principally, robotic submarines that can descend to depths where no human diver might survive -- for more than 30 years, to do every part from turn bolts to close valves. Today's state-of-the-artwork ROV is a $1 million, box-formed steel craft the scale of a small automobile, outfitted with mechanical arms that may carry as much as a ton in weight.

댓글목록

등록된 댓글이 없습니다.